Testimonials

... Marseille for Engineering & Trading (MUE Group) have provided ILF with on ground support on the PMC (Project Management Consultancy) for developing Halfaya Oil Field - Phase I for PetroChina (Halfaya, Southern Iraq). The Halfaya Oil Field is proven to hold 4.1 billion barrels, and in the first phase the production capacity was increased from 3,000 barrels/day to 100,000 barrels/day.

MUE Group have provided to ILF construction management and supervision support in the Mechanical Engineering, Piping Engineering, Electrical Engineering, Civil Engineering, HSE, Welding, Engineering Coordination and Cost Control services on site.

MUE Group's personnel proved to be very professional, hardworking, resourceful and highly experienced, And ILF confirms to be highly satisfied with the services provided by Marseille......

ILF Consulting Engineers

October 04, 2012

 

.. AlBilal Group has contracted with Marseille for Engineering & Trading S.A.L. (MUE Group) for issuing the complete Basic and Detail design documents and technical support for Al-Najaf GTPP (1 x GT8C2 Alsom GT). MUE Group has successfully completed, up to our full satisfaction, all the services required from them contractually and beyond that, with very high dedication and responsiveness to queies, even if they were outside Marseille's contractual commitments.....

AlBilal Group Ltd.

March 12, 2013

 

.. VitzroSys co. has contracted with Marseille for Engineering & Trading S.A.L. (MUE Group) for issuing the complete Basic and Detail design documents and Supervision on works for Al-Rasheed GTPP (2 x Siemens SGT-800 GTs). MUE Group has successfully completed, up to our full satisfaction, all the services required from them contractually and beyond that, with very high dedication and responsiveness to queies, even if they were outside Marseille's contractual commitments.....

VitzroSys Co. Ltd.

May 2010

 

We, Mass Global - IPP of Kurdistan/Iraq, confirm that MUE Group have participated in the tender for the design and supply for converting Erbil Simple Cycle Gas Turbine Powert Plant (consisting of 8 x GE Frame 9E GTs) to combind cycle. Their submitted technical offer including the conceptual/basic designs for the required combined cycle plant was qualified by our owner engineer (the American consultant group Mott MacDolnad) and was considered technical compliant and accepted.

Mass Global Investment Co.

October 2012

 

Al-Ula Engineering has proved to be professional, prompt & delivered the basic design for the plant in total in a record time of 35 days.

POWER MACHINES OJSC

Regarding Dibis GTPP Project

June, 2006

 

It is pleasure that UNDP would like to invite you to bid in one of our upcoming projects. Due to the urgency of the services required and your excellent professional record with UNDP.

United Nations Development Programme
(UNDP)
August, 2009

 

In reference to the efforts spent by UNDP and Al-Ula Engineering Bureau in installing and commissioning a 100 M3/ Hour capacity R.O. unit according to international standards and in an outstanding manner, the people of Khor Al-Zubair town would like to express their gratitude, wishing that your works will continue to serve humanity in the area.

Khor Al-Zubair Town Council
January, 2008

 

Al-Ula Engineering has started its first contract with UNDP during 2005 and is to date providing UNDP with consultancy services covering a diverse range of engineering fields including civil works, electricity, water and sanitations, solid wastes, environmental engineering, hydraulic engineering, mechanical engineering, surveying and so forth.

United Nations Development Programme
(UNDP)
August, 2008